Client: Shepherds Bush Housing Group

Insurer: Aviva

Loss adjuster: McLarens

Value: £850,000

Details:

  • Flood damage occurred Summer 2021
  • 15 lower ground floor units
  • Locations – spread across the local area
  • Phase 1 – strip out and dry out
  • Phase 2 – tanking works direct with employer
  • Phase 3 – reinstatement to 11no units

Key Objectives/Challenges:

  • Obtaining access
  • Tenant disclaimers
  • Tenant chattels
  • Defining the scope during the works
  • Stop start works due to above